Help center
Open dashboard

The Stack: Mapping Your Preferred Plugin to Each Functional Category

Reference data that tells Atarim's workflows and AI which plugin actually handles SEO, security, backups, and more on your sites — configuring it never installs anything.

Atarim team Updated 7 Oct 2026 · 15 min read
Integrations
Atarim settings mapping a preferred plugin to each functional category
Before you start

Relevant for

  • Account Holders and Administrators — The Stack is visible to these two roles only
  • Agencies standardising which plugins they use across client sites
  • Anyone whose workflows or AI recommendations reference the wrong plugin

Required knowledge

Familiarity with the WordPress plugin ecosystem for the categories listed.

Tools & resources needed

  • Settings > AI Web Agency > The Stack
  • No setup required to configure the mapping
  • The Atarim plugin installed on any WordPress site you want detection to run against

The Stack is a mapping between a functional category — SEO, Security, Backups, and so on — and the specific plugin you actually use for it. Workflows and AI read this mapping so their guidance, detection, and recommended actions reference your real tools rather than a generic default. It's reference data: selecting a plugin here tells Atarim which tool to reference, and it never installs, activates, or changes anything on a site.

What It’s For, and Why It’s Worth Filling In

Atarim’s workflows and AI agents constantly need to answer one question: which tool does this job on this site? A caching step needs to know your caching plugin. A security scan needs to know your firewall. Without an answer they either guess at whatever is most common, or give advice too generic to act on.

Advice that names your actual tools

With The Stack filled in, a recommendation about caching names the caching plugin you actually run, and a backup step checks the backup tool you actually use. The difference between “consider enabling page caching” and a specific instruction for your specific plugin is the difference between a suggestion and something your team can execute.

One setup, every site

Set it once at workspace level and every project inherits it. You only revisit it when a particular client site genuinely differs, or when you standardise on a new tool across the board.

Detection that sees behind the login

On sites with the Atarim plugin connected, a scan reads the authenticated plugin inventory rather than guessing from the public-facing page. That’s what lets it confirm admin-only categories like security, backups, and caching, which never appear in a front-end scan.

Completely safe to configure

Nothing on this screen touches a live site. Installation is a separate, later, explicitly approved action — so you can map all fourteen categories, change your mind, and change them back without any risk to a client’s site.

Step-by-Step Guide

Opening The Stack

The Stack is where the AI learns which plugin does which job on your sites, so the badges matter as much as the names.

Instructions:

  1. From the main dashboard, select Settings.
  2. In the menu on the left, under the AI Web Agency heading, select The Stack.
  3. Wait for the categories to load. While loading, the panel reads Loading the stack…
  4. Review each category, the plugin shown against it, and the badge beside it.
The Stack page listing functional categories with their plugins
The Stack page listing functional categories, each with its description, plugin picker, and source badge.
Every Category, With the Plugin That Fulfils It

A notice at the top of the screen states the scope plainly: The Stack only applies to WordPress sites with the Atarim plugin installed, because detection and installs require the connected plugin. You can still set the mapping without it — what you lose is confirmation of what’s actually running.

Tip
The Stack sits under AI Web Agency and is visible to the Owner and Administrators only. Team Members and Collaborators don’t see it.

What The Stack Covers

A fixed list of fourteen functional categories. Each has a one-line description of what it’s for, a plugin, and a badge showing where that plugin came from.

Category What it covers Atarim default
SEOOn-page SEO, meta tags, sitemaps, and content analysisYoast SEO
SecurityMalware scanning, firewall, and login protectionWordfence
BackupsScheduled backups and restore pointsJetBackup
PerformancePage, object, and browser caching plus minificationW3 Total Cache
ImagesImage compression and WebP conversionShortPixel
DatabaseDatabase cleanup and table optimisationWP-Optimize
AnalyticsGoogle Analytics integration and reportingMonsterInsights
FormsContact and lead-capture formsWPForms
EmailEmail marketing automation and CRMFluentCRM
UptimeUptime monitoring and site statsJetpack
HeatmapsSession recordings and heatmapsMicrosoft Clarity
eCommerceStore, products, cart, and checkoutWooCommerce
Redirects301/302 redirects and 404 trackingRedirection
Page BuilderDetection only, no default is setGutenberg assumed
Note
These defaults are Atarim’s tested picks, not requirements. If your agency standardises on a different tool for a category, set it here once and every workflow and recommendation follows.

Reading the Badges

Each category carries a badge telling you where its current plugin came from. This matters because an inherited default and a confirmed installation look identical otherwise.

Badge What it means
Installed on site Confirmed present by a scan of the connected site
Workspace default Inherited from this workspace’s setting
Agency default Inherited from an agency-level setting
Recommended & Tested Atarim’s own recommendation for that category
Atarim default Atarim’s pick where it isn’t flagged as a tested recommendation
Custom Someone picked this plugin manually
Not configured No plugin is set for this category
Note
Where a plugin has been confirmed by a scan, the row also shows a tick reading Confirmed on site beneath the picker.
Tip
A row reading Installed on site is the strongest state — it means Atarim has seen that plugin on the site rather than assumed it. Inherited defaults are useful, but a confirmed installation is what lets a workflow act with certainty.

Setting the Plugin for a Category

Three sources feed the picker — Atarim's curated list, the full WordPress directory, and whatever was detected on the site itself.

Instructions:

  1. Select the plugin name on the right of the row you want to change. Where nothing is set the row reads Select a plugin instead.
  2. Pick from the Curated group to use a plugin Atarim has tested for that category. The curated pick carries a tick and its Recommended & Tested badge.
  3. Or type into the search field to look up any plugin in the WordPress directory. Results appear under WordPress.org, each showing its active install count and when it was last updated.
  4. Or, on a project, choose from Detected on this site. This group sits at the top of the list and each entry carries a blue Installed pill, so you know it’s genuinely present.
  5. Select the plugin. The row saves immediately — there is no Save button — and the badge updates to match where the new value came from.
Curated plugin suggestions shown ahead of the WordPress directory
Curated First, Then the WordPress Directory
Plugin search results with install counts
Search Any Plugin, With Install Counts to Judge By
Project dashboard top bar with the Project brief tooltip
Project dashboard top bar with the Project brief tooltip showing on the document icon.
Switching to Stack and unlocking it to override the mapping
Switch to Stack, Then Unlock to Override
Re-scan Site confirming which plugins are actually installed
Re-scan Site Confirms What’s Actually Installed
Unlocked and scanned, with fourteen installs proposed
Unlocked and Scanned — 14 Installs Proposed
A repeat scan proposing nothing already installed
Scan Again and Nothing Is Proposed Twice
Tip
To revert, pick the Atarim default again. That clears your override rather than pinning a duplicate entry, and the badge reverts to Recommended & Tested.
Note
The WordPress.org group prompts you to type at least two characters before it searches. Long plugin names are shortened in the dropdown once selected — that’s display only, and the full plugin is stored.

Telling the AI How You Use a Plugin

Each row carries a short description of what that plugin is for. Atarim pre-fills it from the recommended plugin, and you can rewrite it — worth doing when you’ve picked a tool Atarim has no description for, or when your team uses a plugin in a particular way.

Instructions:

  1. Select the description text underneath the category name. It looks like static text but it’s editable.
  2. Type your guidance into the text area. The placeholder reads How the AI should use this plugin…
  3. Select Save, or Cancel to discard and keep the previous text.
Field describing how the team uses a given plugin
Tell the AI How Your Team Uses the Plugin

This line is what the AI reads to understand the tool’s role on your sites, so a sentence about how your team uses it is more valuable than a generic product description.

Warning
Choosing a plugin saves the row immediately, but the description editor has its own Save and Cancel buttons. A description you type and navigate away from is lost.

Overriding the Mapping for a Single Site

The Stack also appears on each project, so one site can differ from the rest without you rebuilding all fourteen categories.

Instructions:

  1. On Projects, open the project card’s ⋮ menu and select Manage Project Brief (Beta). Or open the project and select the Project brief icon in the top bar of the Project Dashboard (Beta). If you don’t see either, open the project’s site in Atarim and select Project Brief from the quick actions menu in the bottom bar.
Project Actions menu on a project card with Manage Project Brief highlighted
Manage Project Brief in a project card’s menu (Beta)
  1. In the modal, switch from Brief to Stack using the toggle in the top right.
  2. Find the Inherit from workspace defaults switch. It’s on by default, shown with a closed padlock, and reads Inheriting the workspace defaults, categories are read-only.
  3. Turn the switch off. The padlock opens and the line changes to Unlocked — override any plugin below.
  4. Change only the categories that differ for this site. Everything you leave alone keeps inheriting from the workspace, shown with a Workspace default badge.
Project dashboard top bar with the Project brief tooltip
Project dashboard top bar with the Project brief tooltip showing on the document icon.
Project Brief modal on the Stack tab, with the Inherit from workspace defaults switch on and categories read-only
Switch to Stack, Then Unlock to Override

Scanning a Site to Confirm What’s Installed

A scan replaces assumption with fact, marking the rows Atarim can actually see installed on the site.

Instructions:

  1. On the project’s Stack screen, select Re-scan site. The button reads Scanning site… while it runs.
  2. Wait for the confirmation. The first scan of a site reports how many plugin installs it has proposed, for example Scan complete — 14 plugin installs proposed in the Approval Queue.
  3. Scan again later and, where nothing has changed, the message reads Scan complete — your stack is up to date.
  4. Check the rows that were confirmed. They switch to Installed on site, with a tick reading Confirmed on site beneath the picker.
Re-scan Site confirming which plugins are actually installed
Re-scan site button only appears on a project.
Unlocked and scanned, with fourteen installs proposed
Re-scan Site Confirms What’s Actually Installed
Fourteen plugin installs waiting in the Approval Queue
14 plugin installs proposed in the Approval Queue
Note
Scanning doesn’t only confirm what’s present — it also proposes an install for every category whose plugin isn’t there yet. On a site that has none of them, that means an approval request per category waiting in the queue. Nothing installs without your sign-off, but expect a full queue after the first scan, and decline anything that client doesn’t need.
Tip
An amber notice appears after the scan: We couldn’t read this site’s plugin inventory, so installed plugins are unconfirmed. Connect the Atarim plugin on the site and re-scan to confirm what’s installed. Until then the entries shown are inherited defaults rather than confirmed installations.

Understanding Detection-Only Categories

Page Builder behaves differently from the other thirteen. It’s detection-only, with no Atarim default — Gutenberg, the WordPress block editor, is assumed until a third-party builder is detected on a connected site. Because no plugin is set, the row shows Not configured rather than a green Recommended & Tested badge.

This is deliberate. Page builders are visible in a site’s own content rather than chosen by an agency as a standard, so Atarim detects rather than recommends

Gutenberg assumed as the editor until something else is detected
Gutenberg Is Assumed Until Something Else Is Detected
Warning
Not configured on Page Builder is the expected state, not something to fix. It resolves on its own once a third-party builder is detected on a connected site.

When a Default Needs Setup Outside Atarim

Setting a category’s plugin tells Atarim which tool owns that job, and Atarim can install and activate it for you — both held for your approval when asked for in chat. A few plugins then need a step Atarim cannot take on your behalf.

Uptime is the one to watch. Jetpack, the default for that category, does nothing until a WordPress.com account has been connected to the site. That connection is a sign-in in your own browser, so only the account holder can complete it, and until it is done no Jetpack feature works — downtime monitoring included. Having the plugin installed is not the same as being monitored.

Connect it under an account someone watches
Downtime alerts go to the WordPress.com account that connected Jetpack, and only to that account — Jetpack does not currently allow additional or CC’d recipients. Connected under a client’s personal account, the alerts land somewhere nobody reads. Connect it under an agency-controlled account, or one that forwards to an inbox you monitor. Checks run every five minutes, so a brief outage can pass unnoticed between them.

How Workflows Use The Stack

This is where the mapping earns its keep. Workflow steps that operate on a functional area declare which category they belong to, and the workflow runner resolves that category through The Stack immediately before the step runs.

The step gets your plugin, not a guess

A caching step in a monthly maintenance workflow resolves the performance category and receives your caching plugin. A backup-and-restore step resolves backups and receives yours. The same workflow template therefore behaves correctly across clients running different tools, without you maintaining a separate copy per client.

Every resolution is recorded

The plugin resolved for each step is written into the workflow’s run trace, so when you open a run you can see which tool the step actually used. If a step behaved unexpectedly, the trace shows whether it resolved the plugin you meant.

Resolution never means installation

Resolving tooling and installing tooling are separate. Resolving a category only tells the step which plugin to use.

Runs without a specific site

A workflow run that isn’t scoped to one concrete site — an All Projects run with no task site, for example — has nothing to resolve against, and steps simply run without Stack context.

Note
Because the plugin is resolved per site at run time, you can build a workflow once and deploy it across clients running entirely different tooling. Keeping The Stack accurate is what makes that portability work.

What Happens When a Plugin Is Missing

Configuring The Stack never installs anything. Installation only happens later, at work-execution time — when a workflow or AI chat is doing something that genuinely needs a category’s tooling and finds it missing. From chat, nothing installs on its own:

  1. The chat resolves the category through The Stack and finds no plugin present.
  2. Atarim queues a request in the project’s Approval Queue (Beta) rather than installing.
  3. The entry is titled Install {plugin name} and describes the action as installing and activating that plugin on the site.
  4. Nothing further happens until a person approves it.
  5. On approval, the held action is replayed and the install runs.

Requests are de-duplicated per site and plugin, so asking for the same missing plugin repeatedly won’t fill your queue with copies.

A workflow you have switched on never adds a request here. Switching it on is the sign-off for what it does, so a plugin install in a workflow runs directly.

Note
Installs that The Stack proposes from a scan or from chat always wait in the Approval Queue until a person approves them.

Approving an Install

Configuring The Stack never installs anything, and neither does scanning. Installs are proposed, then wait for a person:

  1. A scan or a chat request resolves a category and finds the plugin isn’t present.
  2. Atarim queues a request in the project’s Approval Queue (Beta) rather than installing.
  3. The entry is titled Install {plugin name} and describes the action as installing and activating that plugin on the site.
  4. Nothing further happens until a person approves it. A request nobody decides on within 14 days is declined automatically, and nothing runs.
  5. On approval, the held action is replayed and the install runs.
Install request waiting for approval before it runs
Every Install Waits for Your Approval
Note
Installs that The Stack proposes from a scan or from chat always wait in the Approval Queue until a person approves them.

FAQs

Does changing a selection here install the new plugin?

No. The Stack is reference data only. Installing a plugin is a separate action on the connected WordPress site. Asked for in chat, it waits for approval.

What if I use a plugin that’s not in the curated list?

Search the WordPress directory from the same picker and choose whichever plugin your stack actually uses. It’s worth editing the description afterwards so the AI knows what you use it for.

Why does scanning propose so many installs?

A scan confirms what’s present and proposes an install for every category whose plugin isn’t. On a fresh site that means one request per category. They sit in the Approval Queue (Beta) until you decide, or for 14 days, after which they are declined automatically. Declining is as valid as approving.

Why does Page Builder show “Not configured” instead of a green badge?

It’s detection-only, so it has no Atarim default to carry a Recommended & Tested status. The picker reads Gutenberg assumed until a third-party builder is detected on a connected site.

Do I have to set The Stack for every project?

No. Set it once per workspace and every project inherits it. Override individual categories on a project only where that site genuinely differs.

Who can edit The Stack?

The Owner and Administrators. It isn’t shown to Team Members or Collaborators.

Does The Stack work on sites without the Atarim plugin?

You can still set the mapping, and workflows will read it. What you lose is detection — Atarim can’t confirm what’s actually installed without the connected plugin.

Can an AI agent install a plugin without asking me?

Not from chat or a scan. Every install proposed there is queued in the project’s Approval Queue (Beta) and waits for a person to sign off. A workflow is different: switching it on is your sign-off for what it does, so a plugin install in a workflow runs without asking again.

Do I need to press Save?

Not for the plugin picker — choosing a plugin saves the row immediately. The description editor is the exception: it has its own Save and Cancel buttons.

How do I know which plugin a workflow step actually used?

Open the workflow’s run and check the trace. The plugin resolved for each step is recorded there, so you can confirm the step used the tool you intended.

Conclusion

The Stack is a small, one-time setup step with outsized payoff. Once it accurately reflects your real plugin choices, every workflow and AI recommendation that touches SEO, security, backups, or the other categories references the tool you actually use rather than a generic guess — and one workflow template works across clients running entirely different tooling.

It's also one of the safest screens in Atarim to experiment with: nothing you do here changes a site, and any install it proposes waits for an approval you grant yourself.

Tips & best practices

  • Fill in The Stack once per workspace — it applies across every connected WordPress site, and projects inherit it automatically.
  • Revisit it whenever you standardise on a new plugin for a category; a stale entry produces confidently wrong AI guidance rather than an obvious error.
  • Rewrite the description when you pick a non-curated plugin — that line is what the AI reads to understand how you use it.
  • Re-scan a site after connecting the Atarim plugin, then work through the Approval Queue (Beta) rather than leaving it full.
  • Only override at project level where a site genuinely differs; leaving categories inherited means one workspace change updates them all.

Related articles